What Does It Cost to Install an EV or Tesla Charger in North Idaho?
- Joe “RD” Means

- Jun 30
- 2 min read

More North Idaho homeowners are going electric every year, and the most common question we get is simple: what does it cost to put a charger in my garage? The honest answer is that it depends on your panel and where the charger goes, but here are the real ranges so you can plan.
Typical EV / Tesla charger installation costs
Basic Level 2 install, with the charger near an existing, healthy panel that has capacity: commonly $500 to $900.
Install that needs a longer wire run or an outdoor, weatherproof location: commonly $600 to $1,200.
Install that requires a sub-panel or a main panel upgrade, common in older homes: commonly $1,500 to $3,500.
Most straightforward installs take 2 to 4 hours. If your panel needs upgrading first, plan on 6 to 8 hours total. These are typical ranges, and your exact price depends on your panel, the distance to the charger, and whether any panel work is needed, which is why we always start with a free quote.
What a proper install includes
A Level 2 charger runs on a dedicated 240-volt circuit. A code-compliant install means the right wire size and breaker for your specific charger, a clean conduit or cable run to the garage or driveway, proper grounding, and, where required, a permit and inspection. Tesla Wall Connectors, Tesla Universal Wall Connectors, and any J1772 or NACS Level 2 charger all install the same way electrically.
Do you need a panel upgrade?
Maybe. A charger can pull 40 to 60 amps, so if your panel is already full or it is an older 100-amp service, you may need a sub-panel or a service upgrade to add capacity safely. We check your panel before quoting so there are no surprises.
Frequently asked questions
Can you install a Tesla charger specifically? Yes. We install Tesla Wall Connectors and all major Level 2 chargers across Coeur d'Alene, Hayden, Post Falls, and North Idaho.
Do I need a permit? Most jurisdictions require an electrical permit for a new 240-volt circuit. We handle permitting so you do not have to.
How long does it take? Usually a few hours, and longer if a panel upgrade is part of the job.
Ready for a charger? Call Problem Solved Electric at (208) 352-0662 or book online for a free quote.



Comments